Search Reports
|
Establishment: 250 - MARTIN STREAM CAMPGROUND Inspection Date: 06/20/2024 Inspection Purpose: REGULAR Status: Passed: 0 Critical, 0 Non-critical violations |
| Violations: |
|---|
| 8.A - Plans for new construction were not submitted. |
| 7.D - There are no water supply outlets and/or water supply outlets are not backflow protected. |
| 3.D - Dump station not provided, properly constructed, provided with suitable hinged cover and/or screw cap, provided with a water outlet posted with a sign that water from this outlet is not for drinking water purposes and/or not protected with an anti-siphon backflow preventer. |